Permit Fees

Permit Type
Fee
Dumpster Permit
$15 on owner's property
$30 on street with a building permit
$60 on street without a building permit
Utility Street Excavation
$100
Building Permit
$50 Minimum, if cost of project is more than $5,000, permit is 1% of the total cost of the project
Fence $30 Minimum, if cost of fence is more than $3,000, permit is 1% of the total cost
Demolition $250 for Commercial or Dwelling
$75 Accessory Structure
Driveway $50 Minimum, if cost of driveway is more than $5,000, permit is 1% of the total cost
Sidewalk $50 Minimum, if cost of sidewalk is more than $5,000, permit is 1% of the total cost